Winter Haulout: 2019

Point Bay Marina, Charlotte, Vermont:  October 11, 2019 - April 20, 2020



Lucy III is all winterized and wrapped up for the winter.  Sue and I came up and did the final wrap.  We removed the cover to the liferaft box for refinishing.  Next is to remove the anchor windlass for repairs and a reinstall.  In fact there is a long list of items to carry out this winter weather permitting.  Lucy III has two excellent built in heating units for in-door work.  The cover/hatch is already ready for installation after 10 coats of spar varnish:


The anchor windlass has been taken home and rebuilt with a new motor, new base and new wiring.  I switched to a 110 volt motor that uses smaller wiring but requires running off of the inverter.  Not a problem with our Freedom 2000 Inverter.  I also purchased new mahogany planks for the gunwale modification.  These pieces will be the cap.


Numerous other projects have been completed including a redo of the 12 volt battery connections and solid aluminum hold down straps for the batteries.